Well, everything important is done! Still need to build a bar and get fabric on the acoustic treatments, but movies can finally be watched. A good 7 month project!
Pic from back of room 106" Matte White screen / Rocket 750s, RSC200 (bigfoot)
Seating position!
From front left corner looking at built in rack under stairs
from front right sectional and cubes bar going behind couch in far corner
audio center Marantz SR7200 Pioneer 45a New separates coming in April (Anthem AVM-30, EMO amp (or Gemstone Audio), Denon DVD-3910, and some type of line conditioner
InFocus SP-7205 HD2+ DLP looking a little sad on DVD's!
surrounds will be mounted on wall very soon says the wife!
screenshot
another
another
final shot leaving the room
looks really great Scott!
sweet
hope i have some thing like that some day
T+
Raphael
WOW... veeeery nice!
very nice Job scott....you did all of the construction yourself? or was the "frame" of the room already there?
Scott, looks great and I bet it sounds the same! I'm envious. Some day... :)
I did all but the sheetrock... here is how the project started back in Feb.
that is awesome...exactly the kind of project I want to do when I get my next house!
Very very nice....(happy for you sad for me grin...) +T
HELLA
that's awesome!
absolutely gorgeous. I hope to do something similar someday.
looks insane!! IMO, 7 months well spent. hopefully someday......
nice, very nice.
no water issues in your basement i hope.
very very very nice congrats on the good work
The 100yr rain event we had in the spring coupled with a slight power outage caused some water to get under the drain tile and had a little bit come through some cracks in the slab. Fixed those in the finised area. I don't anticipate any problems as I went to a battery back-up on the sump pump. All walls were sealed and it helps we live on a rather sandy lot.