Without pics for a visual, I'm going to assume that the 1/2 wall is a 2x4 stud frame wall. The simplest, cheapest way to do it would be to get a pair of threaded pipe flanges to screw to the wall, and basically make a horiz. railing with threaded pipe that faces the stage. Then, several rigs can be clamped to the railing at a time.